Kyra Senese, Managing Editor

Kyra Senese, Managing Editor

Kyra Senese has joined Railway Track & Structures as managing editor, reporting to Mischa Wanek-Libman, RT&S editor.

An Illinois native, Kyra is a May 2016 alumna of Columbia College Chicago, where she earned a Bachelor of Arts degree in journalism with a magazine writing concentration. She initially joined RT&S as assistant editor in August 2016. Kyra previously worked as a research assistant with Advertising Age. Her journalism career began at Columbia’s student-run newspaper, The Columbia Chronicle, where she worked her way up to become editor-in-chief.  

Website URL:

The Foothill Gold Line Construction Authority’s board of directors approved advanced conceptual engineering (ACE) plans for the Foothill Gold Line light-rail project from Glendora to Montclair, Calif.

The Expo Line Phase 2 Extension has become the first transit project to receive Envision™ Platinum certification from the Institute for Sustainable Infrastructure (ISI).

The Port Authority of Allegheny County has announced that crews successfully completed the six-month rail replacement project along the Red Line and the transit agency will resume service between the Fallowfield and Potomac stations Oct. 2.

The Chicago Transit Authority (CTA) has announced that its $203 million Wilson Station Reconstruction Project is more than 50 percent complete.

New York Gov. Andrew M. Cuomo announced a $1.595 billion infrastructure plan Sept. 27 to develop a new train hall serving the Metropolitan Transportation Authority (MTA) Long Island Rail Road (LIRR) and Amtrak.

Tuesday, 27 September 2016 12:56

Gross & Janes names Behan president

Gross & Janes Co. has appointed Bill Behan as the company’s new president, with Mike Pourney acting as CEO and overseeing strategic planning.

Tuesday, 27 September 2016 12:25

Granite JV awarded HART design/build contract

Granite Construction, Inc. (GC) has announced that its joint venture (JV) team has been awarded the design-build contract for the Airport Guideway and Stations project by the Honolulu Authority for Rapid Transportation (HART).

Tuesday, 27 September 2016 11:55

MBTA to open Wachusett station on Friday

The Massachusetts Bay Transportation Authority (MBTA) has announced the Fitchburg Line’s new Wachusett Commuter Rail Station is set for a partial opening on Friday, Sept. 30.

HNTB Corporation has appointed Sanja Zlatanic as chair, national tunnel practice.

Sound Transit kicked off light-rail service to Angle Lake this weekend following a dedication ceremony and inaugural train ride sponsored by Alaska Airlines.

Start Prev 31 32 33 34 35 36 37 38 39 40 Next End
Page 35 of 42